COLD STORAGE MANUFACTURING INC.
Current position:Home > examples > Logistics Warehousing >
Large food cold storage project image

ZTO Express Cold Storage Project

Shanxi Zhongtongji delivers integrated cold chain solutions, specializing in refrigeration systems, thermal insulation, and smart logistics doors. Achieved 30% energy savings and 20% faster delivery f

Project Overview

Shanxi Zhongtongji successfully implemented a large-scale cold chain project integrating refrigeration, insulation, and specialty door systems, achieving energy efficiency and construction quality optimization.

Start time 2024
Industry logistics
Project location Shanxi
Project Name Shanxi Zhongtongji Cold Chain Warehouse Integration Project
Client Shanxi Zhongtongji Supply Chain Management Co., Ltd.
服务范围 Refrigeration/Thermal Insulation/Specialty Doors & Platforms
Construction Area Approx. 28,000㎡
Energy-Saving Target System EER ≥3.5
Core Technology BIM Collaboration + VIP Insulation

Challenges Faced

  1. Multi-System Overlap

    • Simultaneous installation of refrigeration pipes, insulation, and doors caused spatial conflicts.

  2. Extreme Energy Efficiency Demand

    • Client demanded system EER ≥3.5, exceeding industry benchmarks.

  3. Tight Schedule

    • Full project lifecycle (design-build-commission) required within 6 months.

  4. Strict Acceptance Risk

    • 72-hour continuous cooling test with ≤0.5% error margin.

XNAIR Cold Storage Solution

  1. BIM Full-Process Collaboration

    • 3D modeling reduced on-site rework by 80%.

  2. Composite Insulation System

    • 200mm glass wool + VIP panels achieved λ≤0.0025W/(m·K).

  3. Modular Prefabrication

    • 95% prefabrication of doors/platforms cut installation time by 40%.

  4. Intelligent Temperature Control

    • Glycol floor heating + VFD chillers stabilized temperature within ±0.5℃.

1
2
3

Project Results and Benefits

  1. 30% Energy Reduction

    • Annual operating cost saved ¥1.2M vs. conventional systems.

  2. 20% Faster Delivery

    • Modular construction completed 45 days ahead of schedule.

  3. First-Time Acceptance

    • Passed 72-hour cooling test, awarded Grade-A certification.

  4. 40% Lower Maintenance

    • Thermal break design reduced cold bridge risks by 90%.

Achieved 45% comprehensive energy efficiency improvement through integrated system optimization.
The project exceeded expectations in both energy efficiency and construction quality. The intelligent door system reduced truck waiting time by 30%, directly improving our operational efficiency. —— Head of Logistics Center

Do You Also Have Similar Challenges?

No matter your industry, no matter how complex your refrigeration needs, XNAIR Cold Storage can provide you with customized, energy-efficient solutions. Contact us now to start your successful project!

Contact XNAIR Cold Storage Now →

Shanghai XiangNing Electromechanical Equipment Co., LTDXML

联系方式

Need help? Contact us